Empennage
- (67)
-
Polished the stabilator
-
Trimmed stabilator skin
-
Stabilator - Fairing...
-
Drilling emp fairing...
-
Finished fairing...
-
Prepped emp fairing...
-
Drilled empennage...
-
Finished cutting emp...
-
Cut out the top emp...
-
More marking up the...
-
Finished VS and...
-
Polished VS and rudder
-
Started on VS and...
-
Taking everything...
-
More stabilator...
-
Stabilator attached!!!
-
How to waste another...
-
How to waste an...
-
Attached rudder
-
Completed the...
-
Assembled push rod...
-
Fit control surfaces...
-
Fit the vertical...
-
Completed tailcone
-
Began riveting top skin
-
Fit the top tailcone...
-
Completed side skin...
-
Completed right side...
-
More riveting of...
-
Riveted side skins
-
Prepped top corner...
-
Installed some...
-
Completed riveting...
-
More riveting of...
-
Riveted bottom skin...
-
Fit side skirts to...
-
Started work on...
-
Fit aft bulkhead to...
-
Finished riveting...
-
Riveted aft bulkhead
-
Made tie-down bracket
-
Assembled bulkheads
-
Stabilator completed
-
Completed skinning...
-
Began riveting left...
-
Completed right...
-
More riveting
-
Reamed holes
-
Fit skin on stabilator
-
Completed stabilator...
-
Riveted control...
-
Riveting platenuts
-
Spar box assembly
-
Stabilator spar box...
-
Stabilator parts prep
-
Completed right anti...
-
Started on right...
-
Completed left trim...
-
Completed rudder
-
Primed anad riveted...
-
Began work on rudder
-
Completed vertical...
-
Completed VS...
-
Riveted upper spar...
-
Completed other half...
-
First parts for...
-
Kit inventory
Wings
- (54)
-
Replaced right wing...
-
Let's wait some more!
-
More AOA work
-
More odds and ends
-
AOA Retrofit
-
Attached wings
-
Finished work on...
-
Completed right...
-
Flaperon skin riveting
-
Riveted ribs etc to...
-
Prep work on the...
-
Started work on...
-
Riveted skin to...
-
Riveted ribs on...
-
Flaperon work
-
Started on left...
-
Completed right wing
-
Right wing closeout
-
Riveted wing root...
-
Started on wing...
-
Fit the top middle skin
-
Riveted bottom...
-
Completed inboard...
-
Completed inboard...
-
Began skinning right...
-
Finished the left wing
-
Fluted and riveted...
-
Worked on wing tips
-
Drilled out some rivets
-
Completed top of...
-
Started on top skins...
-
Completed bottom...
-
Bottom left center skin
-
Riveted inboard and...
-
Began riveting wing...
-
Wiring runs
-
Installed stall...
-
Completed rib...
-
Began installation...
-
Wing rib riveting
-
Began mounting the ribs
-
Completed nose ribs;...
-
Started working on...
-
Finished W-1208L rib...
-
Started prep work on...
-
Completed rear spar
-
Countersinking and...
-
Rivet hinge bracket...
-
Riveted brackets
-
Primed spar stub...
-
Began rear spar...
-
Riveted wing doublers
-
Started work on wings
-
Wing kit arrives
Fuselage
- (124)
-
Fitting tail cone to...
-
Prepping parts for...
-
Assembling various...
-
Repainted rollbar....
-
Completed fuselage...
-
Riveted angle...
-
Added sealant to...
-
Riveted handle to...
-
Sealed side canopy...
-
Finished riveting...
-
Riveted canopy ribs on
-
Rivet engine mount...
-
Completed canopy ribs
-
Adding remaining...
-
Began working on...
-
Installed upper...
-
Riveted hinge on...
-
Began work on upper...
-
Section 29: Forward...
-
Completed brake lines
-
Started making brake...
-
Drilled brake pedals
-
Expensive brake...
-
Brake pedal drilling
-
Testing of the fuel...
-
Finished sealing...
-
Sealed fuel gauge
-
Section 28: Rudder...
-
Riveted bottom skin...
-
More fuel tank sealing
-
Started sealing the...
-
Nutplates and fuel...
-
Section 26: Started...
-
Completed second...
-
Started working on...
-
Finished a seatback
-
Seatback riveting
-
Started on seatbacks
-
Completed Section 24
-
Roll bar support
-
Rear bulkhead
-
Painted parts of...
-
Removed rollbar
-
Riveted support bracket
-
Side rollbar support
-
Prepping rollbar for...
-
Deburred rollbar
-
Removed rollbar
-
Finished drilling...
-
Started drilling...
-
Fit rollbar
-
Section 24: Rollbar...
-
Completed Section 23
-
Assembled fuselage...
-
Riveted left side skin
-
Added nutplates to...
-
Drilling right longeron
-
Completed right side...
-
Began riveting side...
-
Finished nutplates...
-
Deburred right side...
-
Drilled longeron holes
-
Finished wing...
-
Longerons
-
Riveted forward post
-
Countersunk longeron
-
Attached one...
-
Countersunk wrong...
-
Riveted on seatbat...
-
Primed longerons
-
Drilled top plates...
-
Twisting the...
-
Completed mating of...
-
Completed forward...
-
Bottom skin to firewall
-
Completed firewall...
-
Riveted bottom skin...
-
Firewall work
-
Section 22: Firewall...
-
Completed Section 21
-
The case of the...
-
Prepped aft brackets
-
Riveted forward floors
-
Prepped remaining...
-
Completed riveting...
-
Riveting bottom skin
-
Riveted...
-
Fit bottom skin
-
Prepped bottom skin
-
Prepped up angles
-
Riveted shark gills
-
Began work on 'shark...
-
Riveted forward...
-
More work on forward...
-
More riveting on aft...
-
Fuselage rear bulkhead
-
Added center section...
-
Riveted right side...
-
Riveted left side...
-
Started fitting floors
-
Riveted brackets
-
More rib prep
-
More seat rib work
-
Started on seat ribs
-
Pulley assembly and...
-
Stuck with Cherry...
-
Finished attaching...
-
Finished riveting...
-
Finished riveting...
-
Attached left ribs...
-
Finished right side...
-
Started riveting...
-
Attached nutplates...
-
Various puttering...
-
Riveted floors to...
-
Riveted ELT bracket...
-
ELT bracket
-
More center section...
-
Adding more parts to...
-
Finished drilling...
-
50 down. 74 to go
-
Fit center section...
-
Started on center...
-
Fuselage kit arrives
Finishing
- (69)
-
Sealed rear window
-
Reinstalled window
-
Finished final...
-
Window drilled
-
Now back to the window
-
Attached throttle...
-
Drilling of rear...
-
Fitting of rear window
-
Installed gear leg...
-
More gear leg...
-
Gear leg cover prep...
-
Attached flaperon...
-
Catastrophe averted
-
Riveted top skins
-
Routed new fuel...
-
Connected ADHRS
-
Tail cone goes on
-
Cotter pins in wheel...
-
Starting over on...
-
Cut notches in rear...
-
More rear window...
-
Fit rear window
-
Doing stuff I...
-
Attached oil door to...
-
Finished inlets and...
-
Sanded NACA and airbox
-
Bonded air box and...
-
Prepped filtered air...
-
Bonded NACA vent to...
-
Filled gaps between...
-
Epoxied cooling...
-
Cut out the cooling...
-
Cowling closeout
-
Completed riveting...
-
Start riveting...
-
Fiberglassing work...
-
Drilled the side...
-
Prepared to drill...
-
Drilled side hinges...
-
Drilled aft edges to...
-
Preparing to drill...
-
Trimmed aft sides of...
-
Drilled top cowl and...
-
More trimming and...
-
Spacers for spinner...
-
Finished cowling...
-
Canopy trimming
-
Brake fluid added
-
Brake lines
-
Finished main wheel...
-
Main wheel and tire...
-
Tired
-
Attached engine mount
-
Flap motor
-
Attached flap...
-
Riveted control arms...
-
Drilled rod end...
-
Bolted control rods...
-
Tapped control rods
-
Begin yoke installation
-
Crontrol yoke...
-
Installed pulleys
-
Cable routing
-
Added clamps to...
-
Started working on...
-
Installed control...
-
Prepped control rod...
-
Finishing kit arrived
Canopy
- (28)
-
Set up for canopy...
-
Sanding foam block
-
Bonded foam block
-
Cut foam blocks
-
Prepped for canopy...
-
Canopy guide blocks...
-
Removed struts
-
Started on SB0000-88
-
Riveted front of canopy
-
Ran out of screws
-
Resumed work on canopy
-
Added canopy blocks
-
Canopy latch odds...
-
Guide block nonsense
-
Painted skirts
-
Canopy work
-
Drilled canopy skirts
-
Drilled front and...
-
Drilled front frame
-
Fit canopy
-
Painted canopy frame
-
Canopy prep
-
Riveted side arms on...
-
Fluted canopy frame...
-
Mounted canopy frame
-
Gas struts to canopy...
-
Started on canopy frame
Fuel System
- (12)
-
Reinstalled fuel...
-
Constructed new fuel...
-
Added missing...
-
Remade tank to vent...
-
Fuel prefilter to...
-
Fuel pump assembly
-
Assembled fuel...
-
Ran fuel lines to...
-
Installed fuel valve
-
Remade some fuel lines
-
Started making fuel...
-
Section 27: Fit the...
Firewall
- (3)
-
Heater cable...
-
Heater vent assembly...
-
Vent hinges
Controls
- (13)
-
Set ECO stop
-
Attached throttle...
-
Problem attaching...
-
Prepped flap motor...
-
Primed, painted...
-
Routing throttle and...
-
Throttle system work
-
Started on throttle...
-
Final holes drilled...
-
Time to remove wings
-
Drilled flaperon...
-
Prepped flaperon...
-
Attached flaperons...
Landing Gear
- (30)
-
Set breakout force...
-
Final touches on...
-
Finished (somewhat)...
-
Drilled hinge to...
-
Drilled gear leg...
-
Started on nose gear...
-
Finished nose wheel...
-
Riveted nose wheel...
-
Rivted side brackets...
-
Oshkosh or no?
-
Finished right...
-
Fit right wheelpant
-
Fit right wheelpant
-
Started right wheelpant
-
Completed left...
-
Fixed left wheelpant...
-
Identified left...
-
Installed left...
-
Left axle work for...
-
Landing gear cutout
-
Sand forward half...
-
Adjust left...
-
Trimmed wheelpant...
-
Started on wheelpants
-
Nose gear fork to...
-
Bolted nose gear fork
-
Main gear installed
-
Left side axle
-
Finished left side...
-
Landing gear work
Lighting
- (13)
-
Riveted cockpit...
-
Miscellaneous puttering
-
Completed right wing...
-
Completed AOA...
-
Fixed some wire...
-
Finished right wing...
-
Completed left light...
-
Started on right...
-
Epoxied the lighting...
-
Cut access hole in...
-
Finished landing...
-
Began installing...
Avionics
- (80)
-
Finished GPU...
-
Made a bracket for GPU
-
Wired up White...
-
Mucking around the...
-
Avionics are alive
-
Ground power unit
-
Closed up the panel
-
Sealed wire...
-
Nutplate for fuel...
-
Prepped panel for MFD
-
Removing AMP connectors
-
Cleaning up things...
-
Discovering errors
-
Fitting panels
-
Sealing grommets
-
Installed platenuts...
-
Tidying up some wiring
-
My kingdom for a screw!
-
Installed...
-
Putting stuff back...
-
Installed GEA 24
-
Installed GTR 200...
-
One step back
-
Building supports...
-
ProSealed rivet heads
-
Finished firewall...
-
Firewall drilling
-
Prepped more G3X pieces
-
Prepped G3X brackets
-
Added instrument...
-
Moved autopilot...
-
Installed autopilot...
-
Installed autopilot...
-
Autopilot pushrods
-
Prepped top baggage...
-
Added chafing...
-
Installed ADS-B IN...
-
Reinstalled fuel...
-
It's time to put...
-
Not much of anything
-
Installing equipment...
-
Finished installing...
-
Installing bushings
-
Crimped on...
-
Connected ELT, ran...
-
ELT, Fuel pumps,...
-
Snap bushings and...
-
Two steps forward....
-
Flap motor wiring
-
Installed headphone...
-
Connections to stick...
-
Finished routing...
-
Routed wires on the...
-
GPS/XM wires routed
-
Secured fuse block...
-
Attached Generator A...
-
Connected relay wires
-
Connected G3x wires...
-
Rerouting wires
-
These instructions...
-
Connected coax to...
-
Installed autopilot...
-
Connected trim wires...
-
Routed fuel pump wires
-
Finished pilot-side...
-
Mounted AV-6000
-
Began plotting the...
-
Completed stick wiring
-
Back to work on the...
-
Expanded forward...
-
Evaluated holes that...
-
Enlarged holes
-
The curse of the...
-
Installed ELT.
-
Canopy lock sensor
-
Installed stick grips
-
Drilled hole in stick
-
Com and transponder...
-
CPU fans installed
-
Ordered avionics
Engine
- (35)
-
Finished trimming...
-
Fitting bottom cowling
-
Secured throttle cable
-
Completed heating...
-
Overflow bottle and...
-
Installed oil lines...
-
Attached oil tank
-
Radiator hoses attached
-
Installed oil cooler...
-
Reinstalled muffler
-
Stalled on the...
-
Muffler/exaust...
-
Assembled...
-
Finished pitot tube...
-
Started the cowling
-
Completed Section...
-
Clamped ECU wires
-
Mounted ECU
-
Fuse box work
-
Heat shield and fuse...
-
Cut firesleeve
-
Retorqued engine bolts
-
Hung the engine
-
Drilled second...
-
Solved CPS-1 and 2...
-
Engine mount bolted...
-
Engine mount to engine
-
Removed coolant hoses
-
Completed Section 27
-
Reference pictures...
-
Uncrated the ROTAX...
-
Started putting...
-
Started work on fuel...
-
Powerplant kit arrives
-
Engine shipped
Propeller
- (14)
-
Completed Section 47
-
Set propeller pitch
-
Reinstalled prop
-
Drilled for...
-
Drilled more holes...
-
Fabricated spinner...
-
Drilled spinner to...
-
Drilled spinner to...
-
Aligned spinner
-
ProSealed the pitot...
-
Made spinner cuts...
-
Installed pitot...
-
Started pitot tube...
-
Fitting the top cowling
Interior Finish
- (2)
-
Prepped canopy frame...
-
Primer and etching
Paint / Decals
Inspection
Research
Workshop
- (2)
-
Resurfaced hangar ramp
-
Retired
Service B's
- (29)
-
Completed SB-00088
-
Completed service...
-
Prepped spacers etc
-
Started on...
-
SL-00070
-
Complied with SB 00059
-
Complied with...
-
Complied with...
-
SB fix kits arrive
-
Completed SB-00058
-
Started on SB-00058
-
Preparing to undo...
-
Reinstalled fuel...
-
Began routing wires aft
-
Completed SB-53
-
Started on SB-53
-
Getting ready to...
-
Complied with SB-00013
-
Complied with SB-00023
-
Fully finished SD-00001
-
Mostly finished...
-
Began SD-00001 fix
-
SB 19--08-26...
-
Reinstalled flaperon...
-
Stabilator service...
-
Stabilator service...
-
Stabilator service...
-
Started on service...
-
Service Bulletin...
Builder Name:
Bob Collins
-
Project:
Vans - RV-12iS
-
VIEW REPORTS
Total Hours:
1055
Total Expense:
$101645.34
Start/Last Date:
Jan 04, 2017 - No Finish Date
Engine:
Rotax 912iS
Propeller:
Sensenich
Panel:
Dual screen G3X, autopilot
Friendly URL:
https://eaabuilderslog.org?s=BobCollins
Home or Last Project Picture
Dec 23, 2017
Finished attaching ribs to floor and bulkhead
- (3 hours)
Category: Fuselage
Made good progress. Countersunk and riveted the bearing brackets. Attached the rear baggage bulkhead and riveted. Added more ribs and nutplates and riveted. The thing is getting pretty sturdy.
IMAG0598.jpg
IMAG0599.jpg